Home »
automation and control panels

Production and installation of automation and control panels for the drying tower

PROJECT DESCRIPTION
Production and installation of automation control panels and switchboards for the drying tower using frequency converters and Siemens control equipment. Production and installation of switchboards for Furakawa loader and Wiegand equipment
PROJECT DETAILS

Customer PJSC Bel Shostka Ukraine

Location Ukraine

LIST OF WORKS
  • Control panels designing
  • Switchboards calculation and design
  • Boards manufacturing
  • Software writing
  • Installation on site, disconnection of switchboard and distribution board
  • Сommissioning works
  • Project handover
Gallery

Feedback from our clients



    Leave a comment

    Your email address will not be published.