Home »

PROJECT DESCRIPTION

The reconstruction of the production building by adding an elevator shaft and a transitional transport gallery for automatic transportation of the pallets with finished products. The system is designed to transport formed pallets with the product from the production facilities to the warehouse. The system works in automatic mode, which does not provide for the possibility of human participation after placing the pallets at the starting point.

PROJECT DETAILS

Customer  Nestle Ukraine

Location  Ukraine

LIST OF WORKS

  • Development of the design solution for the elevator shaft construction and transitional transport
  • Construction of foundations, fabrication and metal structures installation
  • Execution of general construction works
  • Lift and conveyor equipment installation
  • Designing of the process control system
  • Switchboard manufacturing
  • Software writing
  • On-site installation, disconnection of the actuators and switchboard
  • Commissioning works
  • Project handover

Gallery

Feedback from our clients



    Leave a comment

    Your email address will not be published.